All posts
Project
5 min read

Emrack Powers Efficient Plasterboard Storage at CSR Gyprock Carrara

We’re proud to unveil our latest project at CSR Gyprock Carrara, where Emrack delivered a tailored cantilever racking solution as part of a strategic upgrade that transformed the site — maximising storage, improving safety & streamlining day-to-day operations in one smart install.
Aerial shot of CSR Gyprock Trade site in Carrara, Queensland

CSR Carrara needed a strategic site redevelopment to improve functionality, boost storage capacity & elevate overall operational safety

The aim was to transform the Eastlake Street facility into a more efficient and trade-friendly environment without expanding its physical footprint. Emrack was engaged to deliver a customised storage solution that would support the daily handling and storage of bulk plasterboard.

Known for its size, weight, and fragility, plasterboard demands a system that offers both accessibility and structural integrity—making Cantilever Racking the ideal choice. Our design team worked closely with CSR Gyprock to specify and install a heavy-duty cantilever system configured for large-format sheet storage.

End-to-End Delivery with Minimal Disruption

From concept through to completion, Emrack provided comprehensive project management services. Every aspect—from design and planning to logistics and installation—was executed to meet the tight operational schedules of an active trade site. The scope of our inclement of the project included:

Site Assessment & Review

Th project began with an on-site consultation and specification of the most efficient racking layout for the unique demands of plasterboard storage.

Project Management

Our project management service offered full coordination of delivery timelines, contractor access and install works, ensuring seamless execution.

Delivery & Installation

Swift and professional installation by Emrack’s in-house team, completed on time, to spec and most importantly — safely.

Our expert team provided detailed planning, engineering and logistics support to ensure that every component was delivered and installed on time and to specification.

Seamless Project Execution & Delivery

The storage redevelopment delivered by Emrack has significantly improved the Carrara site’s performance, contributing to safer operations, greater storage density, and enhanced usability.

ENHANCED ORGANISATION

Strategic racking layouts improved internal flow, reduced congestion and created clear zones for handling and replenishment.

INCREASED CAPACITY

By maximising both vertical and horizontal space, our cantilever system increased the site’s inventory capacity without the need for structural expansion.

BETTER SAFETY & ACCESS

The open-arm cantilever design and upright positioning of materials allow for safer loading and unloading, reducing manual handling risk and supporting compliance.

The Carrara trade store now benefits from a customized cantilever racking solution that enhances storage efficiency and safety. The system supports daily trade activities by facilitating quick access to plasterboard products, thereby improving customer service and operational workflow.

This project underscores Emrack's commitment to delivering tailored storage solutions that meet the unique needs of industrial and retail environments.

Cantilever Racking used in industrial steel and aluminium storage environment

Contact us

Our friendly team would love to hear from you!

Call us

Talk to our friendly team
Mon-Fri from 8am to 5pm
1300 893 909

Chat to sales

Have a question?
Drop us a note
info@emrack.com.au

Visit Us

Visit our office HQ
24 Fenwick Street
Geelong VIC 3220

Connect

Check out our socials!
Facebook    LinkedIn